A mixed integer linear programming model for multi-satellite scheduling

We address the multi-satellite scheduling problem with limited observation capacities that arises from the need to observe a set of targets on the Earth’s surface using imaging resources installed on a set of satellites. We define and analyze the conflict indicators of all available visible time win...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Chen, Xiaoyu (VerfasserIn) , Reinelt, Gerhard (VerfasserIn) , Spitz, Andreas (VerfasserIn)
Dokumenttyp: Article (Journal)
Sprache:Englisch
Veröffentlicht: 2019
In: European journal of operational research
Year: 2018, Jahrgang: 275, Heft: 2, Pages: 694-707
ISSN:0377-2217
DOI:10.1016/j.ejor.2018.11.058
Online-Zugang:Verlag, Volltext: https://doi.org/10.1016/j.ejor.2018.11.058
Verlag, Volltext: http://www.sciencedirect.com/science/article/pii/S0377221718309998
Volltext
Verfasserangaben:Xiaoyu Chen, Gerhard Reinelt, Guangming Dai, Andreas Spitz

MARC

LEADER 00000caa a2200000 c 4500
001 167046508X
003 DE-627
005 20220816202129.0
007 cr uuu---uuuuu
008 190801r20192018xx |||||o 00| ||eng c
024 7 |a 10.1016/j.ejor.2018.11.058  |2 doi 
035 |a (DE-627)167046508X 
035 |a (DE-599)KXP167046508X 
035 |a (OCoLC)1341235262 
040 |a DE-627  |b ger  |c DE-627  |e rda 
041 |a eng 
084 |a 28  |2 sdnb 
100 1 |a Chen, Xiaoyu  |e VerfasserIn  |0 (DE-588)1162092491  |0 (DE-627)1025527550  |0 (DE-576)507140605  |4 aut 
245 1 2 |a A mixed integer linear programming model for multi-satellite scheduling  |c Xiaoyu Chen, Gerhard Reinelt, Guangming Dai, Andreas Spitz 
264 1 |c 2019 
300 |a 14 
336 |a Text  |b txt  |2 rdacontent 
337 |a Computermedien  |b c  |2 rdamedia 
338 |a Online-Ressource  |b cr  |2 rdacarrier 
500 |a Available online 26 November 2018 
500 |a Gesehen am 01.08.2019 
520 |a We address the multi-satellite scheduling problem with limited observation capacities that arises from the need to observe a set of targets on the Earth’s surface using imaging resources installed on a set of satellites. We define and analyze the conflict indicators of all available visible time windows of missions, as well as the feasible time intervals of resources. The problem is then formulated as a mixed integer linear programming model, in which constraints are derived from a careful analysis of the interdependency between feasible time intervals that are eligible for observations. We apply the proposed model to several different problem instances that reflect real-world situations. The computational results verify that our approach is effective for obtaining optimum solutions or solutions with a very good quality. 
534 |c 2018 
650 4 |a Earth observing satellites 
650 4 |a Integer programming 
650 4 |a Mathematical programming 
650 4 |a Scheduling 
700 1 |a Reinelt, Gerhard  |e VerfasserIn  |0 (DE-588)101987113X  |0 (DE-627)691042861  |0 (DE-576)358936187  |4 aut 
700 1 |a Spitz, Andreas  |d 1981-  |e VerfasserIn  |0 (DE-588)1071830643  |0 (DE-627)826370527  |0 (DE-576)43334105X  |4 aut 
773 0 8 |i Enthalten in  |t European journal of operational research  |d Amsterdam [u.a.] : Elsevier, 1977  |g 275(2019), 2, Seite 694-707  |h Online-Ressource  |w (DE-627)306713470  |w (DE-600)1501061-2  |w (DE-576)094058377  |x 0377-2217  |7 nnas  |a A mixed integer linear programming model for multi-satellite scheduling 
773 1 8 |g volume:275  |g year:2019  |g number:2  |g pages:694-707  |g extent:14  |a A mixed integer linear programming model for multi-satellite scheduling 
856 4 0 |u https://doi.org/10.1016/j.ejor.2018.11.058  |x Verlag  |x Resolving-System  |3 Volltext 
856 4 0 |u http://www.sciencedirect.com/science/article/pii/S0377221718309998  |x Verlag  |3 Volltext 
951 |a AR 
992 |a 20190801 
993 |a Article 
994 |a 2019 
998 |g 1071830643  |a Spitz, Andreas  |m 1071830643:Spitz, Andreas  |d 110000  |d 110300  |e 110000PS1071830643  |e 110300PS1071830643  |k 0/110000/  |k 1/110000/110300/  |p 4  |y j 
998 |g 101987113X  |a Reinelt, Gerhard  |m 101987113X:Reinelt, Gerhard  |d 110000  |d 110300  |e 110000PR101987113X  |e 110300PR101987113X  |k 0/110000/  |k 1/110000/110300/  |p 2 
998 |g 1162092491  |a Chen, Xiaoyu  |m 1162092491:Chen, Xiaoyu  |d 110000  |d 110300  |e 110000PC1162092491  |e 110300PC1162092491  |k 0/110000/  |k 1/110000/110300/  |p 1  |x j 
999 |a KXP-PPN167046508X  |e 3502538204 
BIB |a Y 
SER |a journal 
JSO |a {"id":{"doi":["10.1016/j.ejor.2018.11.058"],"eki":["167046508X"]},"origin":[{"dateIssuedKey":"2019","dateIssuedDisp":"2019"}],"name":{"displayForm":["Xiaoyu Chen, Gerhard Reinelt, Guangming Dai, Andreas Spitz"]},"relHost":[{"title":[{"title_sort":"European journal of operational research","subtitle":"EJOR","title":"European journal of operational research"}],"type":{"bibl":"periodical","media":"Online-Ressource"},"disp":"A mixed integer linear programming model for multi-satellite schedulingEuropean journal of operational research","recId":"306713470","language":["eng"],"pubHistory":["1.1977 -"],"part":{"year":"2019","pages":"694-707","issue":"2","volume":"275","text":"275(2019), 2, Seite 694-707","extent":"14"},"titleAlt":[{"title":"EJOR"}],"origin":[{"publisher":"Elsevier ; North-Holland Publ. Co.","dateIssuedKey":"1977","dateIssuedDisp":"1977-","publisherPlace":"Amsterdam [u.a.] ; Amsterdam"}],"id":{"issn":["0377-2217"],"zdb":["1501061-2"],"eki":["306713470"]},"physDesc":[{"extent":"Online-Ressource"}]}],"physDesc":[{"extent":"14 S."}],"title":[{"title_sort":"mixed integer linear programming model for multi-satellite scheduling","title":"A mixed integer linear programming model for multi-satellite scheduling"}],"person":[{"given":"Xiaoyu","family":"Chen","role":"aut","roleDisplay":"VerfasserIn","display":"Chen, Xiaoyu"},{"display":"Reinelt, Gerhard","roleDisplay":"VerfasserIn","role":"aut","family":"Reinelt","given":"Gerhard"},{"role":"aut","roleDisplay":"VerfasserIn","display":"Spitz, Andreas","given":"Andreas","family":"Spitz"}],"language":["eng"],"recId":"167046508X","note":["Available online 26 November 2018","Gesehen am 01.08.2019"],"type":{"media":"Online-Ressource","bibl":"article-journal"}} 
SRT |a CHENXIAOYUMIXEDINTEG2019