Simultaneous calibration of ensemble river flow predictions over an entire range of lead times
Probabilistic estimates of future water levels and river discharge are usually simulated with hydrologic models using ensemble weather forecasts as main inputs. As hydrologic models are imperfect and the meteorological ensembles tend to be biased and underdispersed, the ensemble forecasts for river...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article (Journal) |
| Language: | English |
| Published: |
17 October 2013
|
| In: |
Water resources research
Year: 2013, Volume: 49, Issue: 10, Pages: 6744-6755 |
| ISSN: | 1944-7973 |
| DOI: | https://doi.org/10.1002/wrcr.20542 |
| Online Access: | Verlag, lizenzpflichtig, Volltext: https://doi.org/https://doi.org/10.1002/wrcr.20542 Verlag, lizenzpflichtig, Volltext: https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1002/wrcr.20542 |
| Author Notes: | S. Hemri, F. Fundel, and M. Zappa |
MARC
| LEADER | 00000caa a2200000 c 4500 | ||
|---|---|---|---|
| 001 | 1753584329 | ||
| 003 | DE-627 | ||
| 005 | 20220819161358.0 | ||
| 007 | cr uuu---uuuuu | ||
| 008 | 210409s2013 xx |||||o 00| ||eng c | ||
| 024 | 7 | |a 10.1002/wrcr.20542 |2 doi | |
| 035 | |a (DE-627)1753584329 | ||
| 035 | |a (DE-599)KXP1753584329 | ||
| 035 | |a (OCoLC)1341403947 | ||
| 040 | |a DE-627 |b ger |c DE-627 |e rda | ||
| 041 | |a eng | ||
| 084 | |a 27 |2 sdnb | ||
| 100 | 1 | |a Hemri, Stephan |e VerfasserIn |0 (DE-588)1103501054 |0 (DE-627)861252993 |0 (DE-576)470631201 |4 aut | |
| 245 | 1 | 0 | |a Simultaneous calibration of ensemble river flow predictions over an entire range of lead times |c S. Hemri, F. Fundel, and M. Zappa |
| 264 | 1 | |c 17 October 2013 | |
| 300 | |a 12 | ||
| 336 | |a Text |b txt |2 rdacontent | ||
| 337 | |a Computermedien |b c |2 rdamedia | ||
| 338 | |a Online-Ressource |b cr |2 rdacarrier | ||
| 500 | |a Gesehen am 09.04.2021 | ||
| 520 | |a Probabilistic estimates of future water levels and river discharge are usually simulated with hydrologic models using ensemble weather forecasts as main inputs. As hydrologic models are imperfect and the meteorological ensembles tend to be biased and underdispersed, the ensemble forecasts for river runoff typically are biased and underdispersed, too. Thus, in order to achieve both reliable and sharp predictions statistical postprocessing is required. In this work Bayesian model averaging (BMA) is applied to statistically postprocess ensemble runoff raw forecasts for a catchment in Switzerland, at lead times ranging from 1 to 240 h. The raw forecasts have been obtained using deterministic and ensemble forcing meteorological models with different forecast lead time ranges. First, BMA is applied based on mixtures of univariate normal distributions, subject to the assumption of independence between distinct lead times. Then, the independence assumption is relaxed in order to estimate multivariate runoff forecasts over the entire range of lead times simultaneously, based on a BMA version that uses multivariate normal distributions. Since river runoff is a highly skewed variable, Box-Cox transformations are applied in order to achieve approximate normality. Both univariate and multivariate BMA approaches are able to generate well calibrated probabilistic forecasts that are considerably sharper than climatological forecasts. Additionally, multivariate BMA provides a promising approach for incorporating temporal dependencies into the postprocessed forecasts. Its major advantage against univariate BMA is an increase in reliability when the forecast system is changing due to model availability. | ||
| 650 | 4 | |a multiensemble postprocessing | |
| 650 | 4 | |a multivariate Bayesian model averaging | |
| 650 | 4 | |a multivariate density forecast | |
| 650 | 4 | |a streamflow prediction | |
| 650 | 4 | |a temporal dependence | |
| 700 | 1 | |a Fundel, Felix |e VerfasserIn |0 (DE-588)132375540 |0 (DE-627)690539533 |0 (DE-576)264647963 |4 aut | |
| 700 | 1 | |a Zappa, Massimiliano |d 1975- |e VerfasserIn |0 (DE-588)1058845586 |0 (DE-627)797650172 |0 (DE-576)414935411 |4 aut | |
| 773 | 0 | 8 | |i Enthalten in |t Water resources research |d [New York] : Wiley, 1965 |g 49(2013), 10, Seite 6744-6755 |h Online-Ressource |w (DE-627)324657587 |w (DE-600)2029553-4 |w (DE-576)111315778 |x 1944-7973 |7 nnas |a Simultaneous calibration of ensemble river flow predictions over an entire range of lead times |
| 773 | 1 | 8 | |g volume:49 |g year:2013 |g number:10 |g pages:6744-6755 |g extent:12 |a Simultaneous calibration of ensemble river flow predictions over an entire range of lead times |
| 856 | 4 | 0 | |u https://doi.org/https://doi.org/10.1002/wrcr.20542 |x Verlag |x Resolving-System |z lizenzpflichtig |3 Volltext |
| 856 | 4 | 0 | |u https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1002/wrcr.20542 |x Verlag |z lizenzpflichtig |3 Volltext |
| 951 | |a AR | ||
| 992 | |a 20210409 | ||
| 993 | |a Article | ||
| 994 | |a 2013 | ||
| 998 | |g 1103501054 |a Hemri, Stephan |m 1103501054:Hemri, Stephan |d 110000 |d 110200 |d 110000 |d 110400 |e 110000PH1103501054 |e 110200PH1103501054 |e 110000PH1103501054 |e 110400PH1103501054 |k 0/110000/ |k 1/110000/110200/ |k 0/110000/ |k 1/110000/110400/ |p 1 |x j | ||
| 999 | |a KXP-PPN1753584329 |e 3904501992 | ||
| BIB | |a Y | ||
| SER | |a journal | ||
| JSO | |a {"relHost":[{"name":{"displayForm":["American Geophysical Union"]},"origin":[{"publisher":"Wiley ; AGU","dateIssuedKey":"1965","dateIssuedDisp":"1965-","publisherPlace":"[New York] ; Washington, DC"}],"id":{"issn":["1944-7973"],"doi":["10.1002/(ISSN)1944-7973"],"eki":["324657587"],"zdb":["2029553-4"]},"physDesc":[{"extent":"Online-Ressource"}],"title":[{"title":"Water resources research","subtitle":"WRR","title_sort":"Water resources research"}],"disp":"Simultaneous calibration of ensemble river flow predictions over an entire range of lead timesWater resources research","type":{"bibl":"periodical","media":"Online-Ressource"},"note":["Gesehen am 18.02.2016"],"recId":"324657587","corporate":[{"display":"American Geophysical Union","roleDisplay":"Herausgebendes Organ","role":"isb"}],"language":["eng"],"pubHistory":["1.1965 -"],"part":{"year":"2013","pages":"6744-6755","issue":"10","volume":"49","text":"49(2013), 10, Seite 6744-6755","extent":"12"},"titleAlt":[{"title":"Water resources research online"},{"title":"WRR"}]}],"physDesc":[{"extent":"12 S."}],"id":{"eki":["1753584329"],"doi":["10.1002/wrcr.20542"]},"origin":[{"dateIssuedKey":"2013","dateIssuedDisp":"17 October 2013"}],"name":{"displayForm":["S. Hemri, F. Fundel, and M. Zappa"]},"language":["eng"],"recId":"1753584329","type":{"bibl":"article-journal","media":"Online-Ressource"},"note":["Gesehen am 09.04.2021"],"title":[{"title_sort":"Simultaneous calibration of ensemble river flow predictions over an entire range of lead times","title":"Simultaneous calibration of ensemble river flow predictions over an entire range of lead times"}],"person":[{"given":"Stephan","family":"Hemri","role":"aut","roleDisplay":"VerfasserIn","display":"Hemri, Stephan"},{"family":"Fundel","given":"Felix","display":"Fundel, Felix","roleDisplay":"VerfasserIn","role":"aut"},{"given":"Massimiliano","family":"Zappa","role":"aut","roleDisplay":"VerfasserIn","display":"Zappa, Massimiliano"}]} | ||
| SRT | |a HEMRISTEPHSIMULTANEO1720 | ||